Bathroom renovations
in Toronto & the GTA
A bathroom is the room most likely to fail when it is built fast. Water gets behind the tile, the framing rots, and the repair costs more than the original job. The fix is doing the waterproofing right, before any tile goes on. That is where ELG starts on every bathroom.
From a small ensuite to a full main bath, we handle the plumbing, tile, ventilation, vanities, and fixtures under one contract. You get an itemized fixed-price quote before anything starts, one project manager from the first walk-through to the last, and in-house crews who work across Toronto and the GTA.
What the job includes
- Waterproofing and membrane systems
- Shower and tub installation, including curbless and accessible showers
- Floor and wall tile
- Vanities, fixtures, and lighting
- Plumbing and electrical by licensed trades
- Exhaust ventilation
- Heated floors
Licensed and WSIB-registered, with one accountable point of contact and a schedule you can hold us to. The same crews that earned ELG a 5.0 rating across 40+ Google reviews.
Recent residential projects.
Work completed across Toronto and the GTA. Tap any photo to open the gallery.
From first call
to finished bathroom.
-
01
Walk-through
We measure the room and look at where the plumbing actually runs, so you know on site what can move and what cannot before anyone quotes a number.
-
02
Quote
Itemized line by line after the walk-through: tile, fixtures, trades and finishing priced separately. No catch-all lines that get billed up later.
-
03
Waterproofing
A proper membrane goes on the floor and shower walls before any tile. That membrane is the part that keeps water out of the framing below, and it is the step that decides whether the room lasts.
-
04
Build
A powder room or straightforward bathroom usually runs 2 to 3 weeks on site. A full gut with moved plumbing and custom tile takes longer, and you get a real schedule with the quote.
One call.
One team.
One quote.
Tell us about the bathroom. We will visit the space, document a fixed-price quote, and begin on the date specified in the contract.
- Phone
- 416 · 875 · 0870
- Info@elgservices.ca
- Service area
- Toronto, North York, East York, Vaughan, Richmond Hill, Markham, Aurora, Stouffville
- Hours
- 24/7
Bathroom renovation questions.
How long does a bathroom renovation take?
A small powder room or straightforward bathroom usually runs 2 to 3 weeks on site. A full gut with moved plumbing and custom tile takes longer. You get a real schedule with the quote, not a guess.
How do you stop the bathroom from leaking later?
We install a proper waterproofing membrane on the floor and shower walls before any tile goes on. That membrane is the part that keeps water out of the framing below. Skip it and the leak shows up a year later.
Can you move the toilet, shower, or plumbing?
Yes. Relocating the toilet, shower, or vanity is normal work for our licensed plumbers. We rough in the new lines, then build the finishes around them. A curbless or accessible shower is handled the same way.
Do I need a permit for a bathroom renovation?
If you are moving plumbing or electrical, yes. We pull the permits and handle inspections so you are not standing in line at the city. A straight fixture and tile swap in the same layout usually does not need one.
What does a bathroom renovation cost?
Every bathroom is quoted line by line after a walk-through, so the number reflects your actual layout, tile, and fixtures. No catch-all lines that get billed up later. Send a competing quote and we will show you what it leaves out.
Start with a walk-through
Tell us what you have in mind for the bathroom. You get a clear quote, a real start date, and one person to call the whole way through.
Where we work
ELG builds bathrooms across Toronto and the Greater Toronto Area. Choose your city for local details, or call 416 · 875 · 0870 for a free on-site quote.